I've made a list of jobs around the railway that I would like to complete this year.
This was one of the first bits of the railway to be constructed in 2020. I didn't put enough cement in the concrete mix and it has started to crumble, not to mention the excessive moss growth.
I intend to replace this with a cut-down paving slab.
Main Line |
Last year I eased the curve and concreted the footings. This year I aim to make the embankment. I will be constructing it from broken slabs.
Missing Embankment |
This is Brookside Station in the middle of the branch line. The siding will be completed this year.
The Siding at Brookside Station |
At the approach to Stoke Prior Station, I need to repair this wall. I'm also getting some derailments of the longer wheelbase stock on the curve so the track will need relaying.
Curved Viaduct at Stoke Prior Station |
Another job for this year is is to complete this gabion wall.
Gabions |
No comments:
Post a Comment