The main line is the double track on the left of the photo. The Saltworks will occupy the area on the right of the photo where the 3 sidings are situated. The loop and head-shunt in the middle is where coal trucks will be held after delivery from the main before being taken into the Saltworks. Full salt trucks will also be parked here awaiting collection.
I've put cross-over points each side of the Saltworks loop so that trucks can be taken out onto the main line in either direction.
No comments:
Post a Comment