Wednesday, 28 September 2016

The Pond Area Is Finished

The pond area is finally complete over a year since work started.

The slabs have been pressure washed and re-levelled. The spaces in-between have been filled with beach pebbles.


The log-roll has been re-painted.



 The pond liner has been hidden by placed larger pebbles around the edge.
The bridge has also been pressure-washed.


No comments:

Post a Comment