The pond area is finally complete over a year since work started.
The slabs have been pressure washed and re-levelled. The spaces in-between have been filled with beach pebbles.
The log-roll has been re-painted.
The pond liner has been hidden by placed larger pebbles around the edge.
The bridge has also been pressure-washed.
No comments:
Post a Comment