Tuesday, 15 May 2012

More Work on the Railway

As well as bridging the gap there are a number of other areas of the railway that need attention this year.  This gap was temporarily bridged with a plank of wood.  However it's not the only thing in this area that needs fixing - the embankment on the left is too low!

Shuttering in place for raising the height of the embankment
Another view of the shuttering - ready for adding the concrete
As soon as the concrete had been added the heavens opened and it hasn't stopped raining since.

No comments:

Post a Comment