Thursday 7 July 2011

Closing the Gap

The Viaduct End
More Cain Howley Structures viaduct sections have been purchased from Steve Warrington of Back 2 Bay 6.  These have been roughly positioned ready for final levelling and alignment.
The first few sections of the viaduct
 Another straight viaduct section has been positioned to the left of the new bridge.
An aerial view
To the right of the three viaduct sections a new 1.25m removable bridge (yet to be built) will carry the next section of the line.

The Other End
At the other end of the line foundations have been laid for the first 2.5m and thermalite blocks have been cut to provide the gradient.  These have been roughly positioned ready for final levelling and alignment.
The other end of the new line
The new line will continue to gain height as it runs parallel with the existing lower level line.
Another view of the other end of the new line

No comments:

Post a Comment