Sunday, 19 June 2011

Bridge Construction Begins

The jig for cutting the diagonal struts for the bridge sides.  The site for the bridge is in the background - behind the 'G' clamp.  The tree stump (top right) had to be dug out as in was in direct alignment with the new line.

The plan and the first cut sections.

No comments:

Post a Comment