I've made a start on the most urgent jobs that need to be completed before I can begin filming Thomas' next adventure.
 |
On the mainline the crumbling concrete has been broken up and it's now shuttered ready for re-concreting.
 | The embankment at the start of the branch line has been completed.
|
|
 |
The trackbed has been prepared for the siding at Brookside Station. |
 |
I've taken an angle grinder to the planter and this is what the low stone walls will look like. I now just need to make the mould and get casting. |
No comments:
Post a Comment