Sunday 20 September 2020

A Little More Progress

I have now dug out and roughly levelled the trackbed leading up to the top righthand side of the garden.

Looking up the garden. In the foreground will be Stoke Works Station. The lefthand point will lead to the bay platform.

Looking back down the garden. Stoke Works Station will be sited on the curve.

The top of the garden. The line will go through a 1 metre long tunnel at the deepest point in the cutting.

The inner track will be made from LGB radius 5 curves.