Tuesday 1 November 2022

More Work on the Spiral

A little more work has been done on the spiral. All of the viaduct sections have been postcreted in and concrete blocks have been laid to form the basis for the embankment at the rear of the spiral. The blocks will be clad with concrete wall sections.

I also need to make two bridges - one to link the station area to the curved viaduct and another to link between the curved part of the viaduct and the straight section.

A view from the rear of the spiral.

Looking across the garden towards the tunnel.

Showing the woodland area and path.