Sunday 29 May 2016

All trains cancelled until further notice

Before my enforced 6 month layoff from the railway I had started to re-furbish the pond area, but it seems that over the winter the pond has developed a leak and the water level has dropped by at least 6 inches.
The water used to cover the pond liner below the slabs.
The original water level can be seen marked on the log-roll.
Lots of work to do.

This afternoon I've started work on clearing the site and at the moment I cannot run trains around the garden as I've had to remove the bridge over the pond.

The missing bridge.
All of the slabs have been taken away for pressure washing.
The next job is to get the log-roll out.


No comments:

Post a Comment