Saturday, 24 September 2022
James' Splendid New Red Coaches
Wednesday, 21 September 2022
A Milestone
I've reached a major milestone on my railway today. Yesterday I finished the concreting for the next station on the railway and today I've temporarily laid the track.
Monday, 19 September 2022
Devious Diesel - A Test Run
Diesel has spent several weeks in the Stoke Prior works. He's now been let out onto the main line for extensive testing.
Monday, 5 September 2022
Devious Diesel's Conversion
I converted Paxton to battery power with radio control and sound in April - see April Update. Diesel joined the loco fleet in May but I've only just started the process of carrying out his conversion.
The first photo shows the layout of Diesel's floor. The speaker has been fitted and the holes drilled for the switch (2 holes to right of speaker) and charge sockets (larger hole above the speaker).
This photo shows the template I made for drilling the holes for the speaker cone. The squares are 5mm by 5mm.
Sunday, 4 September 2022
Stoke Prior Station Update
The Stoke Prior Station area is nearing completion. The slab retaining walls are complete and I've cut the track which will link the branch line to the main line and also the branch line run round loop.
Thursday, 7 July 2022
Stoke Prior Station Progress
Thursday, 30 June 2022
The Railway from the Air
Here are a few aerial shots of the railway.
A general view. The building site at the top of the garden is where Stoke Prior Station will be situated. The route of the single track branch line is marked by the slot cut in the lawn. The tunnel will be earthed over and turfed.
![]() |
The branch line will leave the main line at Stoke Prior Station and will descend on a spiral until it passes under the main line. The first part will be carried on a curved viaduct which can be seen on the left of the photo.
Stoke Works Station is still a temporary structure and eventually the Salt Works Sidings will be populated with suitable buildings.
The house end of the garden. The branch line runs in front of the train viewing area and will disappear behind a flower bed before emerging further up the garden. Once the branch line, spiral and Stoke Prior Station are completed the final stage will be a quarry branch running across the lawn and round a pond.