The viaduct project is now well under way. All of the concrete sections were cut down the middle.
![]() |
| Aligning the piers. A temporary pile of slabs was built to ensure that the correct gradient is maintained. |
![]() |
| Everything needs to be checked for gradient, width and track alignment. A wooden frame was constructed to ensure correct spacing. |
The structure was temporarily put together as a final check before concreting the piers in place.
![]() |
| A final alignment check. |
![]() |
| Ready for concreting. |