I've now positioned all 17 retaining walls.
![]() |
| A train emerging from the 'tunnel' |
![]() |
| Looking down the garden. A train about to enter the 'tunnel'. |
I've now positioned all 17 retaining walls.
![]() |
| A train emerging from the 'tunnel' |
![]() |
| Looking down the garden. A train about to enter the 'tunnel'. |
After several days of dry weather the cutting has finally dried out so I've been able to lay double track through it.
Looking down the cutting in the direction of Stoke Works Station.
The winter well and truly scuppered work on the railway. The cutting has never dried out enough for me to be able to dig out the clay.
This video shows the garden pre-railway, some photos of its construction and a tour of the line.
I started work on the railway on the 28th June this year. The 1st December was a rare dry day so I was able to set up the railway for a photoshoot.
![]() |
| Toby at the Saltworks with a train of private owner wagons |
![]() |
| The Saltworks with Stoke Works Station beyond |
![]() |
| Emily in the bay platform at Stoke Works Station |
I haven't been able to get much done on the railway over the last 3 weeks due to a combination of inclement weather, other aspects of my life getting in the way and idleness. However over the last few days I've been working on the site of what will be Stoke Works Station which, as you can see, will be adjacent to the Saltworks. The platforms of the station will be offset.
![]() |
| Looking down the garden. The left hand platform will be situated on the 3 slabs in the foreground |
![]() |