All of the electronic bits and pieces have now been fitted and here are a couple of pictures of the wiring mess which will be hidden inside Toby's body. Everything seems to work and the top still fits on - just.
Friday, 6 February 2015
Toby in the Workshop 9
All of the electronic bits and pieces have now been fitted and here are a couple of pictures of the wiring mess which will be hidden inside Toby's body. Everything seems to work and the top still fits on - just.
Wednesday, 28 January 2015
Toby in the Workshop 8
Toby has now been fitted with battery pack and radio control. The boiler has been temporarily fitted and new handrails have been fabricated.
The final jobs are to fit the smoke generator, the sound card and speakers. There's no room left inside for a 2 inch speaker so I'm waiting for a couple of small laptop speakers to arrive from eBay.
Hopefully Toby's transformation should be completed sometime next week.
Sunday, 25 January 2015
Thomas the Tank Engine and His Friends Discuss G Scale
Thomas and his friends on the Sandwell Valley Railway discuss if they are good for promoting G Scale, or if people seeing them conclude that G Scale is simply all about toys.
Thursday, 22 January 2015
Toby in the Workshop 7
Toby's cab sides and windows have now been tidied up and the paint touched up.
The windows have been glued in place.
|
| Toby's boiler can be glimpsed through the cab door. |
Monday, 19 January 2015
Toby in the Workshop 6
| Top to Bottom: Boiler, rear cab back, front cab back. |
Meanwhile I've fabricated backs for both cabs and started work on the boiler.
The cut out in the front cab back is for the Toby's eye mechanism.
The boiler is being made from 38mm plastic waste pipe. The smoke box and firebox have been made from a No More Nails container.
Toby can't have a complete boiler because of the location of the motor and gearbox. Also enough room is having to be left to add the battery pack, sound and R/C components.
Wednesday, 14 January 2015
Toby in the Workshop 5
Toby's windows have now been made and his cab floors painted.
Toby with glazing temporarily in place.
Toby with glazing temporarily in place.
Tuesday, 13 January 2015
Subscribe to:
Posts (Atom)