The signal box from T & M Models has finally be put in position overlooking Birdlip Junction. The filming of 'Percy Runs Away' can now begin.
Wednesday, 12 March 2014
Saturday, 8 March 2014
Embankment Cladding
The extension to the SVR was completed in 2012 in time for the open day on 28th July, but several areas were left looking quite raw. One of them was this corner where the blocks were left exposed. With the date for the next open day agreed with the management for Saturday 16th August it is time to rectify this situation.
I've recently clad the lower section with a wall section from Cain Howley Structures and weathered stone edging from B&Q. For the upper section I'm trying something a little different. I'm not sure exactly how it will work out yet. I'll post more photos as it develops. The aluminium 'I' beam section is from L.A. Metals of West Bromwich - the same company that supplied the aluminium for all of the SVR bridges.
Wednesday, 26 February 2014
Preparation for the 2014 Season
As well as all of the other jobs around the railway there quite a bit of hedge trimming needed. The holly bush by Birdlip Junction was growing out of control and its shadow was taking precious light from the garden. It's now been chopped down and shaped to a more respectable 8 feet.
| Hedge trimming in progress |
| More leaves on the line |
Saturday, 22 February 2014
Toby Arrives at the Sandwell Valley Railway
A couple of weeks after he arrived in the country Toby has finally made it to the SVR courtesy of Steve Warrington of Back 2 Bay 6.
| Toby and Henrietta crossing the viaduct |
| Toby and Henrietta crossing the viaduct |
Tuesday, 18 February 2014
The 2014 Season
At last it has been dry enough to assess what maintenance is required before the railway can open for the season and, more importantly, the next Thomas the Tank Engine and Friends video. The photos below show the major areas in need of work, but on top of these jobs most of the railway needs reballasting.
After I took these photos I started to clean up the leaves and other detritus off the track. I had just sent the first train around the garden to check that everything was clear when it started to rain again and work had to be abandoned for the day!
After I took these photos I started to clean up the leaves and other detritus off the track. I had just sent the first train around the garden to check that everything was clear when it started to rain again and work had to be abandoned for the day!
| Curved bridge in side garden in need of a new deck |
| Embankment wall needs extending |
| Site for new signal box |
| Birdlip Junction - engine shed and broken lamppost are both in need of repair and replacement |
| Cuttings and tunnels need cleaning out |
| Embankments need finishing |
Friday, 14 February 2014
Transforming Thomas the Tank Engine
Saturday, 8 February 2014
Percy the Small Engine with Sound and Smoke
The railway is looking very sad after the wettest January since records began.
Meanwhile Percy has been in the workshop over the Winter and has now been fitted with battery, radio control, sound and smoke. See Percy undergoing test runs on the Sandwell Valley Railway.
Meanwhile Percy has been in the workshop over the Winter and has now been fitted with battery, radio control, sound and smoke. See Percy undergoing test runs on the Sandwell Valley Railway.
Subscribe to:
Posts (Atom)