Tuesday, 17 July 2012
The Extension Is Now Open
It's been a rare dry day here in West Bromwich so I've been able to get a full day's work in on the railway and the first trains have been run on the extension. A little fettling is still required (like shaving a little off the shed) but it will now be operating on the open day in 11 days time.
Saturday, 7 July 2012
20 Days to My Open Day
Thursday, 5 July 2012
22 days to my open day
| Steps connecting high and low levels |
Thursday, 28 June 2012
Saturday, 23 June 2012
34 Days To My Open Day
Preparation for the open day continues. As most of the work involves concrete, I've had to make the most of this rare dry day - although heavy rain is forecast this evening and over night.
| The last viaduct pier has been cast. |
| A general view of viaduct and station area, taken from near the bottom of the garden. |
| Zooming in shows clearly that the viaduct is on a steep gradient |
Tuesday, 19 June 2012
38 Days To My Open Day
Progress on the railway has been very slow recently due to a combination of poor weather and a nasty bout of man flu.
Another viaduct section has been added - reducing the gap to 26 inches.
On the lower level, I have started putting in the footings for the new station area.
| The viaduct (and gap) and the new station area |
| A view of the viaduct from the shed. In the foreground is the modified embankment which still needs finishing. |
Sunday, 10 June 2012
A New Station
There appears to be a national shortage of viaduct sections so while I'm waiting for more to be produced I've decided to start on the new station area.
Unfortunately this is as far as I got before having to go out. Perhaps if it doesn't rain too much this week I can get the footings in.
| The area marked out with string. In the background is the 'gap' where the viaduct sections will go and to the right is the removable bridge. |
| The station area with the turf removed |