Monday, 14 August 2023

Thomas and Friends in Paxton and the Runaway Trucks

Diesel is in disgrace. Not only had he destroyed Sir Topham Hatt's new paint store, he had also damaged himself so badly that he needed to be sent away for repair.

His replacement is Paxton, another class 08 diesel electric shunting locomotive. He is a friendly and helpful engine. If he has a fault, it is being too trusting, and a repaired Diesel might just take advantage of this!

No trucks were harmed in the making of the video!





Tuesday, 4 July 2023

How many trucks can Paxton pull?

More preparation for Paxton and the Runaway Trucks. The plot requires a thirty-truck train to be pulled by Paxton. Is he able to do it? Watch the video to find out.

Saturday, 1 July 2023

Diesel & Paxton Handling a Long Train up a 1:40 Gradient

A lot of work is being done on the Wychbold and Stoke Prior Garden Railway in preparation for Thomas and his friends next adventure.

The upcoming video will be called Paxton and the Runaway Trucks and it will be the sequel to Devious Diesel's Disaster



Thursday, 22 June 2023

Thomas and the Triffid

I do feel it is so important to ensure that the planting around a garden railway scales in well with the trains, just like this verbascum.




Monday, 29 May 2023

Thomas and Friends in Devious Diesel’s Disaster

There’s a new kid on the block. He's an oily character and doesn't mind who he upsets. Unfortunately poor Toby is the victim of his cruel tongue.

Sir Topham Hatt has had a brand new shed built and he's very proud of it, but with Diesel's couldn't-care-less attitude it may not stay in pristine condition for very long.



Wednesday, 3 May 2023

Filming has begun on a new Thomas and friends video starring Devious Diesel

The peace and tranquility of the Wychbold and Stoke Prior Garden Railway is about to be rudely disturbed.

Thomas and his friends do not know what is about to hit them!

There's a new kid on the block, and he's mean. 



Wednesday, 22 March 2023

A Busy Scene on the Railway

Emily is awaiting her departure time from the terminus station.

Meanwhile James, with his splendid new red coaches is pulling into the other platform.

Thomas with Annie and Clarabel arrived a few minutes earlier and he has now pulled forward to the head-shunt where is waiting for Toby to clear the run round loop.








Monday, 13 March 2023

Platforms

When it's complete the railway will have 4 stations and 8 platforms. So far 2 platforms have been completed and another 2 are under construction.

This is Stoke Prior Station

And this is Brookside Station. I am making the structure of each platform out of 11mm PVC soffit board.

The method of construction can be seen in this photograph.
The side walls have been screwed to the top piece.

The platforms are then clad with 3mm foamex board, scored and painted.. The platform surfaces are sprayed with textured paint.






Tuesday, 14 February 2023

Wychbold Station

Day: 961

Wychbold Station is in the middle of the single track branch line. Initially it will have a passing loop and a single siding.

Yesterday I laid the slab footings for the station area and today I have cut and laid the track.

Top right: Cutting and Tunnel
Top left: Viaduct and Bridge over Branch Line
Foreground: Wychbold Station





Sunday, 29 January 2023

The Garden Circuit is Complete

For the first time today, day 945 since work began, I was able to run a train round a complete circuit of the garden.



Sunday, 1 January 2023

Another Obstacle Removed

There has been an eight metre gap in the branch line for several months. Work was halted as there were a couple of trees that needed attention. One needed trimming and the other one removing, including roots.

The one that need removing has been removed. Hopefully the golden spike will be driven in within the next couple of months and the circuit around the garden will be complete.

Tree Down

Chain Saw Ready

Tree Logged