The replacement station for Stoke Works has now been completed.
I'm also making G Scale gabions using 6mm welded mesh and pea gravel.
The replacement station for Stoke Works has now been completed.
There is now only a small gap that needs to be filled to complete a circuit around the garden.
The temporary station at Stoke Works has been removed. It will be used as a template for its permanent replacement.
The tunnel (in the foreground) has now been grassed over.
A little more work has been done on the spiral. All of the viaduct sections have been postcreted in and concrete blocks have been laid to form the basis for the embankment at the rear of the spiral. The blocks will be clad with concrete wall sections.
I also need to make two bridges - one to link the station area to the curved viaduct and another to link between the curved part of the viaduct and the straight section.
A view from the rear of the spiral. |
Looking across the garden towards the tunnel. |
Showing the woodland area and path. |