Sunday, 21 November 2021

Extending at the top of the garden

At the top of the garden the ground drops away so the plan is that the railway will pass over a short viaduct and a bridge (recycled from the Sandwell Valley Railway) before entering Stoke Prior Station. This will be the end of the double track section. From Stoke Prior Station the single track branch line will descend on a spiral and then pass under the bridge on the double track main line.

Looking down the garden from the tunnel

Looking towards the site of Stoke Prior Station

The viaduct of bridge. Both will need to be widened to take double track

Planning the spiral

Another view of the bridge and viaduct