Now that Winter is setting in work can only be done on rare dry days.
25th October - The blocks in the foreground mark the end of the extension |
28th October - more blackwork done. |
This photo was taken before any work had been done |
May, the greenhouse has gone and the curved viaduct has been dismantled |
The strawberries were delicious |
The strawberry bed has gone. The strawberries are now in front of the shed. |
The area to the right of Percy is for one of the platforms |
The triangle is now almost finished |
A View of the Extension |
The pond has been made larger and a new concrete ring has been cast to support the slabs. |
The bridge over the pond with Birdlip Junction in the background. |
Looking across the rockery to the pond area. |
Thomas, James and Emily watching the children playing on the sand |
The cameraman in action |
A busy scene on the beach |
Thomas basks in the sun |
Thomas and James on the embankment behind the beach huts |
Emily watches as Thomas and James double head the special |
Will 7 coaches be enough for all the people wanting to go to the seaside? |
The children have already changed into their swimming costumes |
Ready to board the Seaside Special |
It's late into the evening when the Seaside Special returns |
A general view of the triangle |
The area behind the sleeper wall which needs filling in |
The curved viaduct - the section nearest the camera has been modified with the angle grinder |
An aerial view |
Looking from the station towards the triangle |
Looking towards the station |
The triangle area
The fence panels have also been replaced. The curved viaduct sections will be used on another part of the triangle.
|
Looking towards the shed |