Now that Winter is setting in work can only be done on rare dry days.
![]() |
| 25th October - The blocks in the foreground mark the end of the extension |
![]() |
| 28th October - more blackwork done. |
| This photo was taken before any work had been done |
![]() |
| May, the greenhouse has gone and the curved viaduct has been dismantled |
| The strawberries were delicious |
![]() |
| The strawberry bed has gone. The strawberries are now in front of the shed. |
![]() |
| The area to the right of Percy is for one of the platforms |
![]() |
| The triangle is now almost finished |
![]() |
| A View of the Extension |
![]() |
| The pond has been made larger and a new concrete ring has been cast to support the slabs. |
| The bridge over the pond with Birdlip Junction in the background. |
| Looking across the rockery to the pond area. |
![]() |
| Thomas, James and Emily watching the children playing on the sand |
![]() |
| The cameraman in action |
| A busy scene on the beach |
![]() |
| Thomas basks in the sun |
![]() |
| Thomas and James on the embankment behind the beach huts |
![]() |
| Emily watches as Thomas and James double head the special |
![]() |
| Will 7 coaches be enough for all the people wanting to go to the seaside? |
![]() |
| The children have already changed into their swimming costumes |
![]() |
| Ready to board the Seaside Special |
![]() |
| It's late into the evening when the Seaside Special returns |
![]() |
| A general view of the triangle |
![]() |
| The area behind the sleeper wall which needs filling in |
![]() |
| The curved viaduct - the section nearest the camera has been modified with the angle grinder |
![]() |
| An aerial view |
![]() |
| Looking from the station towards the triangle |
![]() |
| Looking towards the station |
![]() |
| The triangle area
The fence panels have also been replaced. The curved viaduct sections will be used on another part of the triangle.
|
![]() |
| Looking towards the shed |